Global Turnkey Solutions
Solutions
Overview
Asia-Direct Distribution
Clubstore
eCommerce
Embedded Solutions
Factory Supply
Hybrid Supply Model 80/20
Lifecycle Management
Marketing Samples Fulfillment
Medical Kitting/Trays
Microsoft AR
Pre and Post Sterilization Services
Product Completion
In-Region Postponement
Near-Region Postponement
Asia Postponement
printer friendly
In this model, products are manufactured in Asia, with locally sourced components and air/sea-freighted to the end-customer's region for distribution. This solution is most suited, to high volume/low complexity production of a stable product profile.



Where lead-time allows and air freight costs are not prohibitive, this model provides a low cost solution suitable for many product types.

Criteria: Description
Product cost Low cost labor for product assembly and locally sourced material.
Flexibility Limited flexibility most suited to high volumes.
Lead time Lead-time determined by freight transit time to customer region (air or sea). This could be reduced by direct distribution from Asia.
Logistics costs High freight costs due to bulk and weight nature of product assembled for retail.
Inventory levels High inventory levels to compensate for limited flexibility and long lead-times.



GTS Packaged Solutions
Learn More
Case Studies & Customer Information Overview go
Request a Consultation go
Home | Contact Us | Privacy Policy & Legal Notices | Site Map www.rrdonnelley.com
Copyright ©  2012 R.R. Donnelley & Sons Company. All rights reserved.